Rapid response and OTD keeps F1 team on schedule

Application

One of the world’s foremost Formula 1 racing teams required a high specification sealing solution ahead of their 2012 season.

Problem

The motorsports team urgently required a custom made damper seal in time for the first test session of the season. The car was due to leave the UK within 5 days of the order being placed with PPE. Failure to test the car with the seal in place would affect the set-up and performance.

Solution

PPE machined three different sizes of seal on a rapid five day lead time, but shipped a day early to ensure the seals were received ahead of the car leaving the UK.

Result

The rapid manufacture and on time delivery of high performance custom seals saved £10,000’s in engineering downtime during the test session.

How can we help? Contact our marine & power engine experts to discuss your requirements, or start a discussion online.

Join our mailing list to receive the quarterly PPE enewsletter and be the first to know about all the latest news
Thanks for joining our enewsletter mailing list.

Join our mailing list to receive the quarterly PPE newsletter and be the first to know about all the latest news

  • New products and materials
  • Industry expert advice
  • Case studies
  • Upcoming shows and events

Enter your email and keep in the loop

Thanks for joining our enewsletter mailing list.