email address
password
Forgotten my password

Typical standard lead times for manufacturing moulded O-rings

 

Inside Diameter

Quantity
(pieces)

Lead time
(working days)
< 165 mm
<50
5 days
166 -220mm
<20
5 days
< 35 mm
51 - 250
7 days
< 35 mm
251 - 700
10 days
< 35 mm
701 - 2000
15 days
< 35 mm
2001+
Request quote
36 - 165 mm
51 - 200
7 days
36 - 165 mm
201 - 500
10 days
36 - 165 mm
500+
Request quote
166 - 220.99 mm
21 - 50
7 days
166 - 220.99 mm
51 - 150
10 days
166 - 220.99 mm
151 - 300
15 days
166 - 220.99 mm
301 - 500
20 days
166 - 220.99 mm
501+
Request quote
221 - <650.99mm
< 25
10 days
221 - <650.99mm
26 - 50
15 days
221 - <650.99mm
51 - 250
20 days
221 - <650.99mm
251 - 500
20 days
221 - <650.99mm
501+
Request quote
651 - 1000.99mm
<200
15 days
651 - 1000.99mm
200+
Request quote
> 1001
<200
15 days
> 1001
200+
Request quote


Emergency 48-hour O-ring manufacturing service
 - more info

Inside Diameter

Quantity
(pieces)

Lead time
1 - 220mm
1 - 50
48 hours
Does not include Perlast Perfluoroelastomer (FFKM) materials

High volume O-ring manufacturing service

Inside Diameter

Quantity
(pieces)

Lead time
0.8 - 28mm
1000+
from 10 days
Currently limited to 8 material grades including FKM, NBR, HNBR & EPDM

Lead-times quoted are to be used as a guide. During periods of high demand the lead-times may be extended. If your enquiry is time critical, please speak to your PPE contact for confirmation of lead-time

IDEX - Sealing Solutions
© Copyright Precision Polymer Engineering Ltd.
Registered Office: Greenbank Road, Blackburn, BB1 3EA, England. Registration No. 1476647
Connect with Prepol at LinkedIn Follow Prepol on Twitter